Saturday, February 12, 2011

The Executive Office - (Part 13) - Another Road Trip!

With the jobsite now ready to receive our work, it's time for another road trip.


The truck is ready to load.




Kevin wrapping pieces in protective tissue, then blankets.




The truck's almost loaded. Time to gather the tools.



The office appears as a blank canvas - ready to receive our work.




Installation starts with the credenza, in the far corner of the room.




The cantilevered top fits perfectly between the wall and the window.




Kevin assembles the desk, while Heath works on the motorized TV cabinet.




There's a reason for the cabinet angle - to be explained in a subsequent post.




The lift basket showing built-in mounts to receive the flat screen TV.




The Scotch Bar: Closed




The Scotch Bar: Open




Executive Desk and Credenza.




JLT especially loved the detail on the inlaid wood grommet.




Desk, Credenza, Scotch Bar, and Television Cabinet.



Although this looks like an architectural wall panel, it's actually a built-in closet. This cabinet will be shown in greater detail after the audio-video guys are finished doing their work.

Next: The Executive Office - (Part 14) - The Audio/Video Guys Do Their Thing

No comments:

Post a Comment